We have the capacity to conduct testing using both automated and manual, single or three-phase secondary injection test equipment with GPS time synchronisation.
We also provide extensive testing and commissioning services for SCADA equipment, DMS (Distribution Management Systems), TMS (Transmission Management Systems) or EMS (Energy Management Systems).
Our experienced team includes High Voltage Cable Jointers and operates across Australia.
Our asset management strategies address the full spectrum of availability, reliability, efficiency and lifecycle costs to ensure that assets perform to their full potential and operational life is maximised.